en

Project

Information modelling for the eastern tube of the Karavanke tunnel

Information modelling for the eastern tube of the Karavanke tunnel

During the planning phase, the BIM-approach, BIM 3D modelling of the route and deviations and BIM coordination of sub-models were done for the contracting authority.

During the design phase, we and our partners cooperated in the preparation of the BIM execution plan, produced parametric BIM 3D models for a 620 m long route, service and access routes, and access roads and connections to the locations of surplus inputs, including models of earthworks, drainage and municipal infrastructure. During the designing, BIM-coordination of sub-models was carried out.

Location:

The Karavanke motorway tunnel lies on the X. pan-European transport corridor and connects the A2 motorway in the Republic of Slovenia (hereinafter RS) with the A11 motorway in the Republic of Austria. The planned arrangements are in the area of the municipalities of Jesenice and Kranjska Gora.

Services:

Design of BIM-approach, BIM 3D modelling, BIM-coordination

Investor:

DARS Inc.

This website uses cookies to give you the best, most relevant experience. Using this website means you are OK with this. You can change which cookies are set at any time – and find out more about them – by following this link. With clicking CONTINUE cookie is created, where it's memorized you want to hide this pop-up text. Cookie will not save any personal information.