en

Project

Water management arrangements as part of the project “*IDP for the construction of II. track Maribor – Šentilj – d.m.”

Water management arrangements as part of the project “*IDP for the construction of II. track Maribor – Šentilj – d.m.”

For construction purposes of the II. track of Maribor–Šentilj–national border, we prepared a water management plan of the Cirknica watercourse, the left tributary of Cirknica and several unnamed watercourses.

On the route of the railway line and the deviations of local roads, we made a plan for the regulation of watercourses in the total length of approx. 5 km. All arrangements are foreseen in a sustainable manner and are reasonably placed in the geographical location, taking into account the mitigation measures from the study “Hydrological – hydraulic analysis with flood maps”.

Investor:

Directorate of the Republic of Slovenia for Infrastructure

Production phase:

*IDP – preinvestment design

Year of production:

2013 – 2018

This website uses cookies to give you the best, most relevant experience. Using this website means you are OK with this. You can change which cookies are set at any time – and find out more about them – by following this link. With clicking CONTINUE cookie is created, where it's memorized you want to hide this pop-up text. Cookie will not save any personal information.