In the area of ​​reconstruction of Teharska cesta in Celje we designed a plan for the stormwater pumping station for the purpose of water drainage of the underpass under the railway line.

The pumping station is designed as a reinforced concrete facility with two built-in submersible pumps, from which the stormwater is drawn through the pressure pipes into the nearby shaft of the existing sewerage system. The pumping station is fenced and partially enclosed with a canopy with space for the installation of electric boxes and a diesel generator.

Investor:

Directorate of the Republic of Slovenia for Infrastructure

Production phase:

PZI *PZI = project for execution

Year of production:

2018

This website uses cookies to give you the best, most relevant experience. Using this website means you are OK with this. You can change which cookies are set at any time – and find out more about them – by following this link. With clicking CONTINUE cookie is created, where it's memorized you want to hide this pop-up text. Cookie will not save any personal information.