Hydrological – hydraulic analysis with flood maps as part of the project “*IDP for the construction of the II. track Maribor – Šentilj – d.m.”

Hydrological – hydraulic analysis with flood maps as part of the project “*IDP for the construction of the II. track Maribor – Šentilj – d.m.”

The HH analysis with flood maps was made as part of the idea project (IDP) for the construction of the II. track of the railway line Maribor – Šentilj and the upgrading of the existing track.

The purpose of the HH study was: to identify areas that were exposed to floods, to prepare flood hazard maps and flood risk maps. We prepared a hydrological calculation of the entire Cirknica river basin, carried out a 2D hydraulic analysis of the existing and foreseen state and, in accordance with the rules and the order, anticipated the appropriate mitigation measures in the area under consideration.

Investor:

Directorate of the Republic of Slovenia for Infrastructure

Production phase:

*IDP = preinvestment design

Year of production:

2013 – 2018

This website uses cookies to give you the best, most relevant experience. Using this website means you are OK with this. You can change which cookies are set at any time – and find out more about them – by following this link. With clicking CONTINUE cookie is created, where it's memorized you want to hide this pop-up text. Cookie will not save any personal information.